West Kimberley Power Project, WA
On-site sub-contract services provided by BESST included:
· Electrical support and back-up services
· Assisted proving the capacity of each station, adjusted for ambient
temperature and parasitic loads
· Assisted heat rate testing
· Selection and hire of electrical test equipment
· Preparation of test data for processing and reporting
· Assisted third party measurement of station noise levels, adjusted for
background noise
· Planning and sourcing 9 MW of load banks for load proving of Broome Power Station
These services were for all five stations.
· Electrical support and back-up services
· Assisted proving the capacity of each station, adjusted for ambient
temperature and parasitic loads
· Assisted heat rate testing
· Selection and hire of electrical test equipment
· Preparation of test data for processing and reporting
· Assisted third party measurement of station noise levels, adjusted for
background noise
· Planning and sourcing 9 MW of load banks for load proving of Broome Power Station
These services were for all five stations.